We poured the bond beam on top of the brick walls. As usual, our mix was 3:1 sand to concrete, with added fibers. We used castillos, with extra rebar at corners and above the door and window, as reinforcement.
Once the bond beam had hardened, we made the sophet (out of sheet metal), which seals the eaves, from the gutter board to the bond beam.
We also hung the last of the windows - the only one in the brick walls.

It is amazing the difference in temperature inside the rooms, now that it's all closed off. The only opening is under the door, which will have to wait until we do the floors.