Vela Creations is an in-depth resource for off grid living. The site documents our research and experiences, hoping that they might help others interested in pursuing this lifestyle. This blog is designed to document our day to day experiences as we build our new, sustainable homestead. If you are interested in seeing more photos and videos, we have a flickr account at the following url: http://flickr.com/photos/35090117@N05/collections/

Saturday, August 7, 2010

The cistern is finished

SANY5770We had a week of clear skies, allowing everything to dry out so that we could get a little work done outside.

We had a little cleanup work to do in and around the tank, of course, after so much rain. After that, we:



SANY5729
* put up some vinyl over the bolts, to protect the liner from any sharp edges.
* put up the liner track
* unfolded the liner and put it into the track (very easy as it happens)
* cleaned any mud off the liner
* did the plumbing

The plumbing deserves a little explanation to itself, as it might not be apparent from the photos. The roof has two downspouts, which connect into the same line, buried in the ground (we will eventually concrete around the pipes from the roof to the ground). That line goes into the tank at the top (which is several inches lower than the downspouts of the gutter). Within the line, at the lowest spot, Abe put in a clean-out valve, which we will be hooking onto a hose this week. This allows us to clean out the water that stays in the line periodically.

SANY5749The plumbing from the tank to the house is as you would expect. Coming out of the tank there is a main valve, then a pipe rising into the air, then another valve, then a check valve. The pipe then connects with the existing pipe coming from the cistern (1000 gallons) that is still on the system, and then into the house. The only thing needing extra info is the overflow pipe (the one that goes up into the air). This goes up and pours out where we want the overflow to be. There is another part that is there only if we one day want to add a backup overflow.

So now it's all completely done, minus a few 5 minute jobs (like putting a screen in the gutter, etc.), and we are ready for it to rain. Just need 10 inches to fill her up - over 7000 gallons.
And now the cistern is completely finished.

For all photos, see here.

Wednesday, July 28, 2010

When it rains it pours


It HAS NOT STOPPED RAINING since Jim, Vickie and Em left on Saturday. Spitting, drizzling, raining, pouring - it fluctuates between them all, but amounts to the same thing... it's wet!

Yesterday we woke up to a small tragedy - the pond filled up, and then burst its bank. It's a pretty huge rupture (looks a lot worse from the back) and will need a machine or many weeks of manual labor to fix it. And of course, we can't do anything right now. There is a chance we can fix it without losing all our water, but that will depend on the weather.

As is, we can't do anything right now, either on the pond, the tank, or anything else. None of us are used to spending so much time inside, and are getting a little stir crazy. Maybe things will clear out soon.

For photos, click here.

Monday, July 26, 2010

Connally Visit

This Wednesday, Jim, Vickie and Emily came to see us. We had been telling Leo about them coming for several days, saying that Momo and Popo were bringing a big elephant (that Abe and siblings had played on as kids) and that Em would be sleeping in his room. Each time we would would say that they were coming, he would then say "Big boo (his word for elephant), Em in Leo's night-night".

We met them for lunch at a seafood restaurant in the city and then we all went on to visit a friend of ours in hospital. Armando - he and his wife being our closest friends from the village - is awaiting a back operation for three ruptured discs. He loved seeing Jim and Vickie and was very grateful for the visit - he has now been lying on his back for more than three weeks and is bored (not to mention in pain).

We then went back to our place. This is the first time Abe's sister, Emily, has been here, and the first time that Jim and Vickie have seen everything so green.

Leo definitely remembers them all from May and he rememberes which games to play with each! He has changed a lot since they last saw him, as he is now saying a bunch of words and is more boy than baby. He really loved having them around, so much so that he didn't want to sleep, which caused a few tears.

We hung out at our place, talking, walking around, weighing baby rabbits, etc. We also visited our neighbour's ranch and got some apples from some of his 5000 apple trees.

On Friday, we went to a local fish farm. The place is beautiful. Many ponds, huge trees, picnic and BBQ areas. Abe cooked us some trout and corn, while we did a little fishing and walking. After lunch Abe got to fish some. While Jim and I got one fish each, Abe bagged about 30! They were all little Perch, which we took home to put in our pond (which is now full of water). We still need some Catfish, but that'll have to wait til another day.

They left on Saturday and since then it has not stopped raining. A pretty good excuse to stay inside, read, watch movies and play with the little guy, who is still talking about Momo, Popo and Em.

Thanks for a lovely visit.

For more photos, click here. And for other photos of Leo this month, click here.

Sunday, July 25, 2010

Tank update


We haven't advanced too much from my last post on the cistern, after which we got a huge amount of rain. Everything was so wet that we couldn't get sand for many days. It finally dried up enough to get sand and we did get a slab poured inside the tank. The slab will offer a smooth, strong surface for the liner to sit on, but more importantly it will hold the metal in its shape at the bottom. It also all slopes towards the out-take, making it easy to empty and clean out should we need to do so.

We also got the trenches for the plumbing dug.

We don't have many days left of work to be able to finish it, but it is raining again this weekend, so we'll have to see how it goes. Probably won't be able to do anything until at least Wednesday.

We wish we could have got it all done before the rains had started, but our other projects took longer than we thought and the rains came a little early this year. Oh well, no biggie. We only need 10 inches of rain to be able to fill it, and we should easily have that left once we finish it.

Rabbit weening and weigh in


The first of our two litters of rabbits reached 6 weeks old on Wednesday, so we got all the babies out of the pen to weigh and sex them. Out of the 9 babies, 5 are female, all of which we will be keeping. On average, they weighed 2 pounds (a little under a kilo). The three largest (over 2lbs each) we have put in a separate pen to ween them. We will be weening the other 4 of Reina's babies over the next week or two.

One side note: we used asphalt board (painted) for the shed, and we are not impressed with it. Although it keeps the inside dry, it has bowed considerably. It will work fine for a while, but we will have to replace or cover it some time. We won't be using it again.

For more photos, see here.

Monday, July 19, 2010

Adventures of a little elephant


We went to the city a while ago to get some materials needed for the cistern. On our way back, we stopped at a rest area so that Leo could get out and run around a little.

In his hand, as usual, was his favorite toy, a little elephant. He and the elephant are never far apart, even when he sleeps. He was running around a shrub-like oak tree that had been planted there, and before we could stop him he threw his elephant into the tree. He often does this with toys - he'll throw them somewhere and then enjoy getting them. We have tried (obviously with less than 100% success) to curtail this irritating little habit.

We looked for the elephant for over half an hour, with Leo mournfully, and repeatedly, asking for it. We couldn't find it. We eventually gave up and left, with a very teary Leo.

At home, we showed him his other two little elephants (these are all toys that Abe had as a child), but he didn't want them.

Over the next 10 days, Leo would ask if we could go get his elephant. When we said no, he'd lost it, he would point to the truck and say we could go get it in that.

Well, about a week later, we went back to the city. We had had a huge amount of rain, so we decided to stop and see if the rains had shaken the elephant out of the tree. And sure enough, there it was, waiting patiently for us. Leo was so happy and excited, though he did not seem surprised - that was exactly where he had left it! Sigh.