Vela Creations is an in-depth resource for off grid living. The site documents our research and experiences, hoping that they might help others interested in pursuing this lifestyle. This blog is designed to document our day to day experiences as we build our new, sustainable homestead. If you are interested in seeing more photos and videos, we have a flickr account at the following url: http://flickr.com/photos/35090117@N05/collections/

Showing posts with label gutters. Show all posts
Showing posts with label gutters. Show all posts

Saturday, August 7, 2010

The cistern is finished

SANY5770We had a week of clear skies, allowing everything to dry out so that we could get a little work done outside.

We had a little cleanup work to do in and around the tank, of course, after so much rain. After that, we:



SANY5729
* put up some vinyl over the bolts, to protect the liner from any sharp edges.
* put up the liner track
* unfolded the liner and put it into the track (very easy as it happens)
* cleaned any mud off the liner
* did the plumbing

The plumbing deserves a little explanation to itself, as it might not be apparent from the photos. The roof has two downspouts, which connect into the same line, buried in the ground (we will eventually concrete around the pipes from the roof to the ground). That line goes into the tank at the top (which is several inches lower than the downspouts of the gutter). Within the line, at the lowest spot, Abe put in a clean-out valve, which we will be hooking onto a hose this week. This allows us to clean out the water that stays in the line periodically.

SANY5749The plumbing from the tank to the house is as you would expect. Coming out of the tank there is a main valve, then a pipe rising into the air, then another valve, then a check valve. The pipe then connects with the existing pipe coming from the cistern (1000 gallons) that is still on the system, and then into the house. The only thing needing extra info is the overflow pipe (the one that goes up into the air). This goes up and pours out where we want the overflow to be. There is another part that is there only if we one day want to add a backup overflow.

So now it's all completely done, minus a few 5 minute jobs (like putting a screen in the gutter, etc.), and we are ready for it to rain. Just need 10 inches to fill her up - over 7000 gallons.
And now the cistern is completely finished.

For all photos, see here.

Saturday, August 29, 2009

Gutters


The roof to the kids' rooms is now finished.

- We put the remaining layers of latex concrete on the roof.
- We filled up the holes we had left for easier access.
- We painted the whole thing with a white waterproofing paint.
- We attached gutters to the sides.

So that roof is now done and catching water.

More photos

Sunday, August 2, 2009

The Roof and Water Catchment

Seeing as it's rain season, water is of particular interest, as this is when we collect most of our year's water. That said, getting the roof totally finished was a priority.

When I say roof, I actually mean roofs, as it not only includes the kitchen, dining room, living room (30ft x 13ft total), but also the entranceway (6ft x 8ft) and the building we are currently living in (12ft x 20ft). All of the roofs connect and are curved in an arch, which is structurally far stronger than a flat surface, and obviously increases the surface area (for example, instead of the 30ftx13ft floor area, the roof is 30ft x15ft).

From the inside to outside, the roofs consist of:
a ceiling of arched rafters and tin
8 inches of polystyrene
a layer of black plastic
a 3 inch concrete slab, reinforced with rebar and remesh. Our mix was 3:1 sand/cement, with fibers and waterproofing agent added
a layer of cement, lime and fibers
waterproofing acrylic paint, which we applied in 2 coats with a fabric in between. This fabric gives the paint flexibility and strength, so should a small crack appear in the concrete, the paint will not crack on top of it

The hardest aspect of this roof was making sure that the gutters didn't have any low spot where water could pool.

When it was all finished we let a couple of rains wash it off really well, then hooked it up to our system. A little under 4 inches collected over 1200 gallons. Unfortunately (well, fortunately, I guess) our tanks are now all full. We have bought another 1000 gallon tank, which we will be setting up this week. Our plan had been to build an7000 gallon concrete tank, for which the hole is already dug and a road to it cleared, but the house has taken longer than expected, so we have postponed that project until the Spring. Still, we have easily enough to last us through until the next rains, and then next year, with the added 7000 gallons, will see us with enough to really take gardening seriously.

On a side note, our pond now has quite a bit of water in it. We need to cut a few trenches to channel the water better, but have not yet had chance. Still, it increases with each rain and holds the water really well. Little by little.

More Photos

Saturday, May 30, 2009

South wall

We have made a lot of progress the past couple of weeks. I am now able to work full time again, and I had forgotten how much I love stuccoing! I have no pain in my stomach at all.

We've been leveling (with a two inch incline over thirty feet) and stuccoing the gutters, which are now ready for rain. (photos)

We have also begun on the south windows. The south walls of the dining room and living room are almost entirely window. This not only allows for solar gain in winter, but also year-round growing, as there are flower beds (which will use grey water from the bathroom and kitchen) at their base. Abe welded up and hung the window frames and we are now stuccoing around them. It has really changed the look of the place. (photos)

Have finished digging out the cistern hole, which is the next project once we finish these rooms. (photos)

We feel as though the end is finally in sight. There's still a lot to do, but each week sees the list get smaller and the house look prettier. We are ready for this too be done, that's for sure!

Sunday, April 5, 2009

Bits and pieces

While waiting for the wind to die down, we filled our time by doing some odds and ends.

Abe prepped the roof of the room we are living in for the roof by tying rebar and lathing to the gutters, as they have to be lengthened to allow for the insulation. (photos)




I did a little more work on the flowers beds. (photos)




We then poured the backing and shelf behind a bench we'll be making in the living room. (photos)